Investigative Committee of Armenia releases the expert report on Amulsar
14.08.2019 | 17:52 Home / News /

Image by: Amulsar

The document is 220 pages long and comprised of 5 parts and a memorandum.
Paragraph 1.0 of the memorandum, titled “Supplemental Mitigation and Contingent Measures”, indicates that “Generally, the design concepts used in the Amulsar ESIA/EIA for development of mitigation measures are reasonable and appropriate”. At the same time, the report urges Lydian to apply supplemental measures to ensure safer operation of the time and provides a list of proposed measures.
The Investigative Committee requested the complex ecological, geological, hydrological, geophysical, chemical, construction and engineering examination on 18 March 2018, from the expert group of Advanced Resources Development (ELARD).
The group submitted the report to the committee on 7 August 2019.
The document was translated from English into Armenia by the corresponding department of the committee. It is now available to the public in two languages.
Last news
29.04.2025 | 10:20 News
28.04.2025 | 14:40 News
Byblos Bank Armenia engages CCF 2K25 visitors with business photo corner
25.04.2025 | 16:36 News
Կարծիքներ
Հարգելի այցելուներ, այստեղ դուք կարող եք տեղադրել ձեր կարծիքը տվյալ նյութի վերաբերյալ` օգտագործելուվ Facebook-ի ձեր account-ը: Խնդրում ենք լինել կոռեկտ եւ հետեւել մեր պարզ կանոներին. արգելվում է տեղադրել թեմային չվերաբերող մեկնաբանություններ, գովազդային նյութեր, վիրավորանքներ եւ հայհոյանքներ: Խմբագրությունն իրավունք է վերապահում ջնջել մեկնաբանությունները` նշված կանոնները խախտելու դեպքում: